Pointe at First Hill Condominium - Seattle, WA
The project included all existing joint sealant and backer rod to be removed and replaced at base of wall and windows The buildings exterior surfaces were prepped received two coats of paint. Where necessary, damaged hardie plank siding and rot repair was replaced. Concrete post tension cable caps were repaired along with the concrete stem wall and perimeter walls.
Project Details:
Location: Seattle, WA
Architect/Consultant: Kilburn Architects & CWD Group
Final Contract Amount: $330,711