West Mall - Everett, WA

 

Multiple building site. Exterior re-clad inclusive of new roof, siding, windows, sliding glass doors, new hand rails, patio deck coating and exterior paint. Installed new water supply lines into over 200 units requiring movement of furniture, extensive sheet rock repairs, new fire caulking and painting. Installed new exterior drainage lines within covered garages. Required hundreds of feet of new drainage trenches, new pipe and concrete to cover.

Project Details:

  • Location: Everett, WA

  • Architect/Consultant: The Soltner Group

  • Owner: Epic Asset Management

  • Final Contract Amount: $3,300,000